Design and Manufacture of Purpose Made Steel Formwork

Sea wall formwork at North Portsea Island

 

 

Sea Wall Formwork Arial View of step formwork

Sea Wall Formwork supplied to Knights Brown Construction -The third phase of the North Portsea Island Coastal Flood & Erosion Tipner Lake phase.

Knights Brown Construction needed formwork to follow the varying contours of the shore line for defense against flooding and erosion.

Special formwork designed and manufactured bespoke formwork in various radii to cast the steps and wall.

Arial photos supplied by Knights Brown Construction – https://www.knightsbrown.co.uk/projects/north-portsea-island-cferm-phase-3-tipner-lake/

This slideshow requires JavaScript.