Skip to main content

Baldock Bypass

Baldock Bypass A505 – We had the job to construct a twin-bore tunnel on a fairly steep incline and had two changes of direction within its length.  Special Formworks handled the design and supplied the materials; we also manufactured the curved forms for the semicircular soffit.  The soffit forms sat on a mobile gantry designed and supplied by RMD Kwikform using proprietary equipment.  The main contractor was Norwest Holst Ltd, and Boretech Ltd was concrete and steel fixing subcontractors.